Identify the unit
Record package configuration, exact model, matched rating, capacity, efficiency, weight, dimensions, and footprint.
Phoenix rooftop package-unit scope
A rooftop or package-unit price can depend on far more than the equipment. Put model and weight, location and curb assumptions, roof responsibility, access and lifting, transitions, utilities, weatherproofing, permits, startup, cleanup, exclusions, and changes in writing.
General information only · Not structural, roofing, lifting, gas, electrical, code, or permit advice
Price the whole boundary
City of Phoenix resources provide permit context, while DOE and AHRI provide equipment and performance reference points. The proposal should still assign project-specific roof, lifting, utility, weatherproofing, permit, verification, and change responsibilities.
Record package configuration, exact model, matched rating, capacity, efficiency, weight, dimensions, and footprint.
Document existing and proposed location, curb or adapter, roof access, support, and any structural or roofing exclusion.
Identify equipment removal, lifting or crane scope, access conditions, scheduling, protection, and responsible provider.
Separate duct, electrical, gas, condensate, controls, flashing, sealing, and weatherproofing responsibilities.
State permits, startup, testing, cleanup, disposal, exclusions, verification triggers, and written change control.
Quote fields
A decision-ready rooftop proposal assigns responsibility for each transition without implying that every listed item is required on every project.
| Field | Decision-ready answer | Reason to clarify |
|---|---|---|
| Equipment | Model, configuration, rating, weight, dimensions, and footprint | Only brand, capacity, or efficiency appears |
| Location and support | Location, curb or adapter, access, support, and roof assumptions | Roof or structural responsibility is silent |
| Removal and lifting | Removal, lifting method, access, protection, and provider | Crane or lifting work is assumed but not priced |
| Transitions | Duct, electrical, gas, condensate, controls, and weatherproofing are assigned | The equipment price hides interface work |
| Completion and changes | Permits, startup, cleanup, exclusions, verification, and written changes | Unknown conditions can alter price without approval |
Read the result
Ask who owns the curb, roof, lifting, transitions, utilities, weatherproofing, permits, and cleanup.
Define the inspection or measurement, evidence, allowance, price method, and written approval trigger.
Compare price while preserving different support, lifting, transition, weatherproofing, and warranty assumptions.
Primary sources
City entry point for residential plan review and permit guidance.
City of Phoenix Residential Projects ↗City technical guideline for replacement project conditions.
City of Phoenix AC Replacement Guideline ↗Federal efficiency-purchasing context for residential central air-conditioning equipment.
DOE Residential Central Air Conditioners ↗Certified equipment-combination and performance records.
AHRI Certified Product Directory ↗Sources reviewed August 27, 2026. Confirm project-specific roof, structural, lifting, utility, weatherproofing, code, and permit requirements with the responsible authorities and licensed professionals.
Common questions
Do not assume it is included. Ask the proposal to state the removal and lifting method, provider, access and protection assumptions, scheduling, price, exclusions, and change terms.
The quote should assign curb or adapter, flashing, sealing, weatherproofing, roof repair, and any structural or roofing verification instead of leaving the boundary implied.
Identify duct, electrical, gas, condensate, controls, startup, testing, permit or inspection, cleanup, disposal, documentation, exclusions, and written change control.
Already holding a written quote?
SecondLook preserves the written equipment, lifting, transition, weatherproofing, permit, exclusion, and price conditions before comparing a lower option.