Phoenix HVAC sizing evidence

Does the quoted HVAC capacity have a home-specific load calculation behind it?

A capacity number is easier to compare when the proposal shows what home facts and design conditions support it. Use the quote to separate the load calculation from the later equipment choice.

General information only · Not a load calculation, equipment-sizing, engineering, or code opinion

Keep the decisions separate

Load calculation first. Equipment selection second.

ACCA describes Manual J as its residential load-calculation standard. A quote review can verify whether a home-specific calculation is documented and whether the proposed capacity is connected to it; it cannot recreate or certify the calculation.

01

Calculation method

Ask whether the proposed capacity is supported by a home-specific Manual J calculation, and identify the method or software used.

02

Home inputs

Record the measurements and envelope assumptions used, including windows, insulation, orientation, infiltration, and other relevant property facts.

03

Design conditions

Ask for the indoor and outdoor design conditions and both sensible and latent cooling loads shown in the output.

04

Calculation scope

Clarify whether the work is a whole-home block load or room-by-room calculation and what parts of the home were included.

05

Equipment selection

Keep the load result separate from the later equipment-selection decision. The quote should explain how proposed capacity follows from the calculation.

Quote fields

Ask for the evidence that makes capacity comparable.

A complete response can use the contractor's own format, but it should resolve these decision fields.

FieldDecision-ready answerReason to clarify
MethodCalculation method or software and dateOnly square footage or old tonnage is cited
Property inputsMeasurements and relevant envelope assumptionsGeneric or unknown assumptions
Conditions and loadsDesign conditions plus sensible and latent loadsOnly a final tonnage appears
ScopeBlock or room-by-room and included areasThe calculation boundary is unclear
Selection basisHow the proposed capacity and later model selection use the resultThe output and equipment do not connect

Read the result

Clarify, verify, or compare.

Clarify

No home-specific evidence is named.

Ask what method, inputs, and design conditions support the capacity.

Verify

A calculation exists but the bridge is incomplete.

Reconcile the output with the proposed capacity and model-selection basis.

Compare

Both proposals document their sizing basis.

Compare assumptions and differences before treating either tonnage as equivalent.

Primary sources

Use the standard owner's guidance.

Sources reviewed August 25, 2026. Confirm project-specific calculations and commitments with the responsible licensed contractor.

Common questions

Know what the calculation can—and cannot—settle.

Is replacing the old unit with the same tonnage enough?+

Existing tonnage is a useful fact, but it is not a home-specific load calculation. Ask what current property inputs support keeping or changing that capacity.

Does Manual J select the exact model number?+

No. Manual J estimates heating and cooling loads. Equipment selection is a later step, commonly associated with Manual S, that considers the load and the performance of a specific system.

Should the contractor provide the calculation output?+

Ask for enough written output to understand the inputs, design conditions, calculated loads, and connection to the proposed capacity. The contractor can explain the form and level of detail it supplies.

Already holding a written quote?

Make the sizing basis part of the market bar.

SecondLook preserves the capacity and documented sizing assumptions before comparing a lower option.

  • No deposit
  • No contractor visit without your approval
  • 15% of verified savings only if you use a lower comparable option
Founding cohort · 10 market checksNo deposit

Show us the quote to beat.

Start with the price or the document. We can collect the project details when we follow up.

Add project details now Optional
No upfront deposit. If you choose a lower comparable quote we find, the pilot fee is 15% of verified savings. If we do not save you money, the fee is $0.